Choose the right band

Compare candidate bands using path geometry, propagation, spectrum conditions, legal access and available equipment.

Lesson 03Planning15 minTechnical review 28 Aug 2026
Engineering scope. Fixed terrestrial point-to-point RF links. Educational planning material only; it does not replace a site survey, equipment documentation, spectrum authorisation, electrical design, or competent safety review.
Learning outcome

The decision you should be able to make

Select a candidate band while documenting the risks it transfers to clearance, capacity and reliability.

Core engineering

For identical path geometry, lower frequency has a larger first Fresnel zone. Lower frequencies may be less affected by some blockage mechanisms, but penetration, diffraction and clutter loss depend on material, geometry and model; 'lower always penetrates better' is not a design rule.

Higher-frequency systems can use compact high-gain antennas, but alignment sensitivity, rain, gaseous absorption and hardware limits become increasingly important in microwave and millimetre-wave bands.

Spectrum authorisation, device class, EIRP, DFS, AFC, indoor/outdoor limits and coordination are country-specific and can change.

Equipment and field checks

  • Compare certified regional variants, supported channel widths, antenna options and receiver thresholds at the intended modulation.
  • Check whether the radio reduces conducted power at higher modulation, channel width or temperature.
  • Do not buy equipment until the exact band and operating mode are lawful at both endpoints.
Pass gate

Do not progress until

At least two candidate bands have been compared for clearance, predicted receive level, interference, availability, capacity and authorisation.

Limits and cautions

  • Band comparisons are conditional on the same service target and stated equipment. Marketing range figures are not propagation evidence.

Primary sources

Sources were checked for this technical review. Recheck regulator and equipment requirements at the point of design or installation.

  1. ITU-R P.526-16: Propagation by diffraction
  2. ITU-R P.530-19: Terrestrial line-of-sight system design
  3. ITU-R P.676-13: Attenuation by atmospheric gases
  4. Ofcom: Fixed wireless access in 5725-5850 MHz
  5. 47 CFR 15.407: U-NII device requirements